The newly inaugurated Pamban Bridge in Rameshwaram, Tamil Nadu, is designed to withstand cyclones of greater intensity than the 1964 disaster that significantly damaged the old bridge. The new bridge features a vertical lift spanner and is built to withstand wind speeds of 230 kmph and considerable seismic loading, according to a senior official from the Rail Vikas Nigam Limited (RVNL). The bridge's construction incorporated several safety protocols, including a seated lift spanner and girders positioned well above sea level, ensuring minimal risk from high tides and cyclones.